翻訳と辞書
Words near each other
・ Project Condign
・ Project controller
・ Project COPE
・ Project cost management
・ Project Country
・ Project Crimson
・ Project Cuddle
・ Project Cumulus
・ Project Cybersyn
・ Project 1221
・ Project 1231
・ Project 13
・ Project 131
・ Project 1640
・ Project 17
Project 17A-class frigate
・ Project 1950
・ Project 1975
・ Project 2010
・ Project 2012 (Hersheypark)
・ Project 2049 Institute
・ Project 21
・ Project 211
・ Project 21900 icebreaker
・ Project 22220 nuclear-powered icebreaker
・ Project 23000E
・ Project 25
・ Project 28
・ Project 2x1
・ Project 365


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Project 17A-class frigate : ウィキペディア英語版
Project 17A-class frigate

The Project 17A-class frigate is a follow-on of the Project 17 for the Indian Navy. A total of seven ships will be built at Mazagon Dock and GRSE. The construction of the first ship is expected to start by early 2017 and is expected to be launched by 2020, after the shipyards are upgraded to incorporate modular construction techniques.
The anticipated cost for each vessel is above and the total deal is expected to be worth more than . The vessel will incorporate the latest stealth features. The first ship is expected to roll out by 2022.〔
== Design ==

The experience gained in designing the Project 17 ''Shivalik''-class frigates will be applied to the Project 17A (P17A). The Project 17A frigates will improve upon the Project 17 (P17) in terms of stealth. They will have covered mooring deck and the number of antennae on the ship will be reduced by using a multi-functional phased array (probably AESA) radar. The P17A will also feature better roll stabilisation and a discreet visual profile. The weapon platform in the P17A ships will be compact and they will be armed with the Barak 8 (missile) surface-to-air missile developed jointly by India and Israel, and the BrahMos cruise missile. The weapon systems will be flush deck mounted allowing vertical launch of missiles from under the deck. The crew complement will be reduced from the existing 257 (including 35 officers) to about 150 by using high levels of automation, which will reduce the operational costs by around 20 per cent and result in higher operational availability of the warships.〔 The construction times will be reduced and productivity will improved by using modular integrated construction. The ship will have a displacement of 6,000 tonnes.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Project 17A-class frigate」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.